Construction progress

Construction status:

In the third quarter of 2019, all the work required to put the house into operation was completed. CHICAGO Central House passed the inspection and received a DABI certificate on July 23, 2019.

Currently, the house is undergoing final work.

status status
23

floors

completed

Works against 0,000 - 100%
Frame -36.04%
Brickwork - 9.79%
Interior fittings - 0%
80%

Interior fittings

Windows - 0%
Facade - 2.5%

Inside - 0%
Outsid - 0%

We regularly inform you about the stages of work by posting photo reports.

see the progress webcam
07 October 2019 year
eye
20 September 2019 year
eye
06 September 2019 year
eye
27 August 2019 year
eye
09 August 2019 year
eye
29 July 2019 year
eye
11 July 2019 year
eye
01 July 2019 year
eye
14 June 2019 year
eye
29 May 2019 year
eye
17 May 2019 year
eye
06 May 2019 year
eye
05 April 2019 year
eye
21 March 2019 year
eye
07 March 2019 year
eye
21 February 2019 year
eye
07 February 2019 year
eye
28 January 2019 year
eye
11 January 2019 year
eye
28 December 2018 year
eye
10 December 2018 year
eye
26 November 2018 year
eye
09 November 2018 year
eye
26 October 2018 year
eye
08 October 2018 year
eye
26 September 2018 year
eye
12 September 2018 year
eye
27 August 2018 year
eye
16 August 2018 year
eye
30 July 2018 year
eye
16 July 2018 year
Construction activities
eye
02 July 2018 year
eye
18 June 2018 year
eye
29 May 2018 year
eye
15 May 2018 year
eye
16 April 2018 year
eye
28 March 2018 year
eye
07 March 2018 year
eye
19 February 2018 year
eye
24 January 2018 year
eye
09 January 2018 year
eye
21 December 2017 year
eye
30 November 2017 year
eye
21 November 2017 year
eye
02 November 2017 year
eye
26 September 2017 year
Arrangement of vertical elements of the 10th floor, brickwork at level 5 level. Installation of windows on the 1st floor, facade 1-2 floor. Arrangement of stairs of basement and 1 floor.
eye
08 September 2017 year
Arrangement of vertical elements of the 10th floor, brickwork at the 4th floor, installation of windows on the 2nd floor level.
eye
29 August 2017 year
Arrangement of vertical elements of the 8th floor, brickwork at the 3rd floor level. Installation of windows on 1-2 floors.
eye
11 August 2017 year
Arrangement of vertical elements of the 6th floor, brickwork at the 3rd floor level.
eye
28 July 2017 year
A floor slab and vertical elements are being installed on the 4th floor. A floor slab on the 5th floor is about be installed. The elevator shaft on the 4th floor is about to be completed.
eye
18 July 2017 year
A floor slab and vertical elements are being installed on the 4th floor. A floor slab on the 5th floor is about be installed. The elevator shaft on the 4th floor is about to be completed.
eye
30 June 2017 year
A floor slab and vertical elements are being installed on the 4th floor. A floor slab on the 5th floor is about be installed. The elevator shaft on the 4th floor is about to be completed.
eye
09 June 2017 year
A floor slab and vertical elements are being installed on the 4th floor. A floor slab on the 5th floor is about be installed. The elevator shaft on the 4th floor is about to be completed.
eye
30 May 2017 year
A floor slab and vertical elements are being installed on the 4th floor. A floor slab on the 5th floor is about be installed. The elevator shaft on the 4th floor is about to be completed.
eye
11 May 2017 year
A floor slab is being installed between the 2nd and 3rd floors. Vertical elements of the third floor are being installed. The elevator shaft on the 3rd floor is being fitted.
eye
27 February 2017 year
A monolithic frame is being installed and the second level of the car park is being concreted.
eye
14 February 2017 year
A monolithic frame is being installed and the second level of the car park is being concreted.
eye
31 January 2017 year
A monolithic frame is being installed and the second level of the car park is being concreted.
eye
05 January 2017 year
A monolithic frame is being installed and the second level of the car park is being concreted.
eye
04 November 2016 year
Commencement of pile field works and reinforcement of the basement vertical components
eye
15 October 2019 year
eye
30 September 2019 year
eye
17 September 2019 year
eye
02 September 2019 year
eye
19 August 2019 year
eye
02 August 2019 year
eye
19 July 2019 year
eye
05 July 2019 year
eye
24 June 2019 year
eye
07 June 2019 year
eye
23 May 2019 year
eye
10 May 2019 year
eye
19 April 2019 year
eye
29 March 2019 year
eye
13 March 2019 year
eye
27 February 2019 year
eye
14 February 2019 year
eye
01 February 2019 year
eye
21 January 2019 year
eye
08 January 2019 year
eye
26 December 2018 year
eye
04 December 2018 year
eye
20 November 2018 year
eye
02 November 2018 year
eye
19 October 2018 year
eye
02 October 2018 year
eye
18 September 2018 year
eye
03 September 2018 year
eye
20 August 2018 year
eye
07 August 2018 year
eye
23 July 2018 year
eye
09 July 2018 year
eye
23 June 2018 year
eye
12 June 2018 year
eye
22 May 2018 year
eye
02 May 2018 year
eye
10 April 2018 year
eye
19 March 2018 year
eye
27 February 2018 year
eye
08 February 2018 year
eye
15 January 2018 year
eye
26 December 2017 year
eye
12 December 2017 year
eye
24 November 2017 year
eye
10 November 2017 year
eye
25 October 2017 year
eye
18 September 2017 year
Construction of the floor slab floor 10, brickwork at the level of 4-5 floors. Facade construction.
eye
04 September 2017 year
Arrangement of vertical elements at the level of 8 floors, brickwork at the level of 3 floors. Installation of windows on floors 1-2 and facade works on 2 level.
eye
22 August 2017 year
Arrangement of vertical elements of the 8th floor, brickwork at the 3rd floor level. Installation of windows on 1-2 floors.
eye
07 August 2017 year
Arrangement of vertical elements of the 6th floor, brickwork at the 3rd floor level.
eye
24 July 2017 year
Arrangement of vertical elements of the 6th floor, brickwork at the 3rd floor level.
eye
10 July 2017 year
A floor slab and vertical elements are being installed on the 4th floor. A floor slab on the 5th floor is about be installed. The elevator shaft on the 4th floor is about to be completed.
eye
23 June 2017 year
A floor slab and vertical elements are being installed on the 4th floor. A floor slab on the 5th floor is about be installed. The elevator shaft on the 4th floor is about to be completed.
eye
19 June 2017 year
A floor slab is being installed between the 2nd and 3rd floors. Vertical elements of the third floor are being installed. The elevator shaft on the 3rd floor is being fitted.
eye
19 May 2017 year
A floor slab is being installed between the 2nd and 3rd floors. Vertical elements of the third floor are being installed. The elevator shaft on the 3rd floor is being fitted.
eye
07 March 2017 year
A monolithic frame is being installed and the second level of the car park is being concreted.
eye
20 February 2017 year
A monolithic frame is being installed and the second level of the car park is being concreted.
eye
07 February 2017 year
A monolithic frame is being installed and the second level of the car park is being concreted.
eye
21 January 2017 year
A monolithic frame is being installed and the second level of the car park is being concreted.
eye
15 December 2016 year
A pile field is being made and vertical structures of the ground floor are being reinforced
eye

Feedback

Name:*
E-mail:
Telephone:*
Message text:*